Projects

CITIZEN JOURNALISM

THE PHOTO BOOK ABOUT SWEDEN
(January 2007 – January 2011)
Stories where 44 young photographer depict Sweden, in a contrast to a Sweden whicn normally is depicted in a static and romantized way with red cottages, ABBA, midsummer, dark forests and blondes. Book published in 2009. Exhibition have been held in Stockholm. Skövde, St. Petersburg and Moscow. Also exhibitions in Buenos Aires (Nov 2010) and Tbilisi, Georgia (Nov 2010). The idea became the platform for the Stories Projects.
More info + slideshow.
GEORGIA STORIES
(March 2010 -)
Citizen Photojournalism Project. 34 Young Georgians tell stories about their everyday lives with photo and text. Co-op with Arteast, partly funded by the Swedish Insitute. Exhibition held at the Rustaveli Theatre in Tbilisi, Georgia, November 2010. Exhibition was showed at Stallet in Stockholm, september 2011.More info + slideshow.
ART

THIS MUST BE THE PLACE
(February 2008 – January 2011)
An art book that features 43 young contemporary artists from Sweden. The idea was to create a project where young people choose young people’s art instead of the classic ”Old Curator – Young Artist-syndrome”. Our vision has been to create an alternative to an existing narrow needlehead (often old gallerists) where young artists have to pass to be published or exhibited. Book Release & Exhibition held in Stockholm (April 2010) where over 900 attended the opening. Exhibition in Buenos Aries (Nov 2010).
More info + slideshow.
MI SUECIA
Buenos Aires, Oberá and Montevideo.
The Exhibition shows how young people in Sweden look upon their lives. The project aims to be an injection of the young and modern Sweden of today. How is growing up in Sweden? What do Swedish young people dream about? What are their plans for the future? More info..
EDUCATION / IDEA DEVELOPMENT

PROJECT OF HOW
(December 2011-)
The project (a free online space) collects insights, methods and thoughts, to explore the creative process through a method bank connected to video interviews around how we do things. More info here here.
ANDAMAN VISIONS
(April 2011-)
Creating visions about a future Andaman Islands. More info here here.

EXPERIMENTS

THE BREAKFAST PROJECT
(January 2011-)
Co-creation experiment to shows people’s breakfasts with formatted photos.
More info + slideshow.